Export Logistics Tool · Xiamen Port (XMN)

Pilates Equipment Container & CBM Freight Calculator

Estimate packed export crate volume (CBM), total gross weight, and whether your commercial studio or distributor order fits LCL sea freight, a 20GP container (~26.5 CBM usable), or a 40HQ high cube (~64 CBM usable).

Need Room Sizing First? Studio Planner →Model Studio ROI & Payback →
01 · Start From a Typical Export Load
02 · Adjust Export Crate Quantities by Model
Model & SKUPacked CBM / UnitGross Weight / UnitQty
PLR-REF-M01 · Nordic
1.00–1.15 CBM115–130 kg
PLR-REF-A01 · Urban
0.80–1.00 CBM95–110 kg
PLR-REF-H01 · Heritage
1.00–1.15 CBM120–135 kg
PLR-REF-F01 · Nordic
0.72–0.90 CBM82–98 kg
PLR-TWR-M02 · Nordic
1.05–1.35 CBM140–165 kg
PLR-CAD-M03 · Nordic
Packed inside crate165–195 kg
PLR-CHR-M04 · Nordic
0.40–0.55 CBM38–48 kg
PLR-BRL-M05 · Heritage
0.55–0.75 CBM45–58 kg
PLR-PRT-S01 · Performance
Packed inside crateBundled spares

FOB Xiamen or CIF Australian main port; fumigation-free plywood crates suitable for DAFF inspection.

Xiamen Port (XMN) Dispatch

How We Pack & Load Mixed Pilates Orders

Mixing wooden Reformers, anodized aluminum frames, Towers, Wunda Chairs, and spare-part cartons in one container reduces wasted air volume. Aluminum frames can ship semi-knocked-down at 0.80–1.00 CBM per unit, while full-frame solid maple Reformers travel inside reinforced fumigation-free plywood crates (~1.00–1.15 CBM).

  • No timber fumigation delays: Engineered export plywood crates avoid raw solid-wood quarantine holds in Australia, the US, UK, and EU.
  • Pre-loading photo & video log: You receive crate dimensions, serial batch photos, and container loading photos before the doors are sealed.
  • Free spare-part nesting: Replacement springs, straps, and bearings pack inside unused crate voids with zero extra CBM charge.

Request Confirmed Container & Freight Quote

Enter your work email and WhatsApp/phone — your selected SKU mix, CBM, gross weight, and destination port are attached automatically.

Export & Planning Guides

Shipping, Crating & Equipment Sizing Notes

View All Planning Guides →